Home
Services
Service Areas
Gallery About Us Blog Contact Call · (919) 440-1333
Skip to content
Black flake epoxy garage floor with built-in shelving in Goldsboro, North Carolina
Black flake epoxy garage floor with built-in shelving in Goldsboro, North Carolina
Wilson, NC

Floors worth looking down at, Wilson.

Metallic, flake and quartz systems for homes around Wilson. Insured, bonded, and poured by the owner.

Insured and bonded · 5 years · every floor poured by the owner

Get a free quote

Photos and rough square footage get you a real number.

No obligation. We come look at the actual slab.

Wilson, NC

Resin floors for Wilson homes.

The concrete around Wilson is no different from anywhere else in the county. What differs is how long it has been left open to whatever lands on it.

We run out to Wilson from the shop in Goldsboro, about 35 minutes out. Wilson is in Wilson County, and we cover the towns around it too, including Black Creek, Lucama, Stantonsburg, Saratoga.

The difference between a coating that lasts nine years and one that peels in nine months is almost never the resin. It is what happened to the concrete before the resin went down.

We own the grinders outright. Renting by the day puts a clock on the most important step, and the grind is the step that decides how long the floor lasts. So it goes the same way on every job: diamond grind to open concrete, chase and fill whatever cracks appear, then pour and topcoat. No shortcuts in the first half.

Local conditions

What eastern North Carolina does to a slab.

Sandy ground and a water table that moves through the seasons are what make humidity the surprise here. Moisture sits close under the slab, and if the concrete has no vapor barrier it travels straight up through it, every day, for the life of the floor. Nothing about that changes when a coating goes on. A coating that lets vapor through survives it. One that traps it gets pushed up in blisters and sheets.

So we test before we quote rather than after. If the slab is wet we say so and price the system that can handle it, and if it is bad enough that no coating belongs on it we will tell you that too. It is a shorter conversation than the one that happens a year after a floor fails.

Heat speeds resin up. The cure is a chemical reaction, and the warmer the slab and the air, the faster it runs, which cuts into the time we have to work the material. In an uninsulated Wilson garage that shows most in the summer months, and most of all on metallic pours. We set the schedule with that in mind.

The work

Recent pours

Black and gold metallic epoxy floor with a mirror gloss finish in Goldsboro, North Carolina
Black and gold metallic pour photographed close, high gloss with ceiling lights reflected
Black and white marbled metallic epoxy floor in a Wayne County, North Carolina home
Black and white marbled metallic floor in a dark interior room
Dark metallic epoxy garage floor with a sports car parked on it in Goldsboro, North Carolina
Dark metallic garage floor with a red Corvette parked on it, paver driveway beyond
What people ask for

Which rooms we end up in.

There is usually a stain next to the driver’s door. That spot, where the car has dripped for years, is one of the most common reasons we end up in a garage, because nothing poured on it ever gets it out. Garages are the bulk of our work, and two-car bays come up almost every week.

Plenty of people who call about a garage end up asking about the kitchen. Countertops are the other side of the business: resin goes over your current counters, so your Wilson kitchen looks brand new while the cabinets and plumbing stay exactly where they are. You can read how we pour countertops before you call.

Timing a pour around the weather.

Spring and fall book up first. Mild weather gives resin the widest working window, so those are the months everybody wants. Summer works fine as long as the pour is scheduled early in the day, and winter works as long as the slab is warm enough.

What moves the price.

Measuring the room is quick. The condition of the concrete is what takes judgment, because that decides how long prep takes, and prep is where most of the labor goes. A sound slab with nothing on it comes in lowest. Cracks to chase and fill, a coating to strip off, or deep oil all add hours.

So we come look at the floor in person. You get a firm number on the day of the visit, and it does not creep up once the grinders are running. If you would rather check the range first, photos of the slab are enough for a rough yes or no.

How the two days run.

Expect noise on the first day. We unload the grinders and the dust extraction, take the whole slab down to bare concrete, then go back over the cracks and pits the grind opened up and fill them. That prep is the heavy, dusty part and it eats most of the hours. The coating goes down on the second day, base pour and then the topcoat.

Everything has to come off the floor before we get there, shelving and all. The grinder covers the whole slab edge to edge, so an empty room on the first morning is the one thing we ask for. After the topcoat you can walk on it the next day. Driving on it waits until day three or four.

Why us

Who actually pours it.

Beto Ponce does the pours himself. The person who quotes your floor is the person standing on it with a squeegee.

Insured and bonded, 5 years of pours, and a phone the owner answers. See the gallery, read about the rest of Wilson County, or send photos of the slab.

Coverage questions are a quick phone call. Wilson is inside our area, which runs across 10 counties out of Goldsboro and about 60 miles in any direction. Addresses out on the edge are usually fine too, since a town or county boundary does not tell you much about the actual drive. Ask before you count yourself out.

FAQ

Questions from Wilson customers

How much does a floor cost?

There is no fair number until we see the slab. A sound floor and a cracked, oil-soaked one of the same size price very differently, and the system you choose matters too. Give us a call at (919) 440-1333 and we will come out.

Do you work in cold weather?

Most winter days, yes. It comes down to the temperature of the slab itself, because a cold slab slows the reaction that cures the resin. When it is too cold for a good finish, we push the date back rather than risk the floor.

How long will it last?

A properly prepped residential floor is a ten to fifteen year surface. The ones that fail early almost always failed at prep, not at the resin.

Do you move what is in the room?

No, and it is the one thing we ask of you. The space has to be completely empty the morning we start because we grind the whole slab rather than working around things. Doing it the weekend before is easier than doing it that morning.

What happens if it rains that week?

Interior work carries on. Outdoor work moves, because resin curing under rain or heavy dew is ruined resin. We would rather shift a date than pour into a forecast we do not like.

Got a slab in Wilson?

Send a couple of photos and the rough square footage. We will tell you what it takes.

Look at real floors in the gallery, then call. Beto Ponce answers, and he is the one who would do the work.

(919) 440-1333