Home
Services
Service Areas
Gallery About Us Blog Contact Call · (919) 440-1333
Skip to content
Epoxy Flooring Contractor | Sharpsburg, NC | Alpha Resin
Black flake epoxy garage floor with built-in shelving in Goldsboro, North Carolina
Black flake epoxy garage floor with built-in shelving in Goldsboro, North Carolina
Sharpsburg, NC

Floors worth looking down at, Sharpsburg.

Metallic, flake and quartz systems for homes around Sharpsburg. Insured, bonded, and poured by the owner.

Insured and bonded · 5 years · every floor poured by the owner

Get a free quote

Photos and rough square footage get you a real number.

No obligation. We come look at the actual slab.

Sharpsburg, NC

Resin floors for Sharpsburg homes.

We get to Sharpsburg often enough that the trailer knows the way.

We run out to Sharpsburg from the shop in Goldsboro, about 35 minutes out. Sharpsburg is in Wilson County, and we cover the towns around it too, including Wilson, Black Creek, Lucama, Stantonsburg.

A floor is the one surface in the house that gets walked on, parked on, dropped on, and then judged anyway.

The sequence is the same on every floor. Diamond grind the slab down to clean, open concrete. Chase and fill the cracks the grind exposes. Pour, then topcoat. The grind is the part that decides whether the floor is still holding in ten years, which is why we own the equipment rather than renting it by the day.

Local conditions

The ground under a Sharpsburg slab.

This is coastal plain country. Sandy soil, a water table that rises and falls through the year, and eight months of genuine humidity. Slabs poured on that ground move a little, and the fine cracking that comes with it is normal rather than alarming. What matters is catching it during the grind instead of coating over it.

Vapor drive is the bigger issue. A lot of the housing stock here went down before vapor barriers under slabs were standard practice, so those floors move moisture upward every single day. Trap that under a coating and it lifts. We test for it up front, because finding out afterward is expensive for everybody.

Then there is the heat. A resin pour in an uninsulated garage in August behaves differently from the same pour in October, and on a metallic floor that difference shows up in the pattern. Knowing that is most of what five years of pouring in this climate buys you.

The work

Recent pours

Black and gold metallic epoxy floor with a mirror gloss finish in Goldsboro, North Carolina
Black and gold metallic pour photographed close, high gloss with ceiling lights reflected
Black and white marbled metallic epoxy floor in a Wayne County, North Carolina home
Black and white marbled metallic floor in a dark interior room
Dark metallic epoxy garage floor with a sports car parked on it in Goldsboro, North Carolina
Dark metallic garage floor with a red Corvette parked on it, paver driveway beyond
What people ask for

Which rooms we end up in.

The rooms change but the problem does not. Bare concrete is porous, it stains, it dusts, and sealing it after the fact with something off a shelf almost never holds.

Countertops are the other half of the business. The resin pours over the counters that are already there, so a Sharpsburg kitchen changes completely without a tear-out, without new cabinets, and without a week of plywood while a slab gets templated. See how countertop pours work.

Timing a pour around the weather.

We pour most of the year. What moves a date is slab temperature, not the calendar, so a mild January week is often better than a brutal July afternoon.

What moves the price.

The honest answer on price is that we cannot give one over the phone and mean it. Two rooms the same size can be a long way apart once you know what is under the old coating.

Which is why we come out and look. You get a number the day we walk the slab, and that number does not move once the work starts. Send a couple of photos and we will tell you whether we are in the right range before anybody drives anywhere.

How the two days run.

Day one is prep. Grinders and dust extraction come off the trailer and the slab gets taken down to clean concrete, then the cracks and pits that the grind exposes get chased out and filled. It is loud and it is dusty, and it is most of the labor in the job. Day two is the pour and the topcoat, which is the fast half.

The room has to be completely empty the morning we start, because we grind the whole slab rather than working around things. Light foot traffic is fine the next morning. Vehicles go back on at day three or four depending on how warm it is, and rushing that is the one shortcut that will mark a brand new floor.

Why us

Who actually pours it.

Alpha Resin is a small shop on purpose. Fewer floors, poured by the person whose name is on the truck.

Insured and bonded, 5 years of pours, and a phone the owner answers. See the gallery, read about the rest of Wilson County, or send photos of the slab.

If you are on the edge of town or just outside it, call and ask rather than assuming. Town lines and county lines rarely match how far a trailer actually has to drive, and the answer is usually yes. Alpha Resin covers 10 counties out of Goldsboro, and Sharpsburg sits well inside that.

FAQ

Questions from Sharpsburg customers

Do you take on small jobs?

Yes. A single-bay garage, a laundry room, a set of counters. Small work is a good share of the schedule and it is how most people try us before a bigger job.

Is there a warranty?

Yes, and it is worth reading rather than framing. Ask when we quote and we will tell you plainly what it covers and what it does not.

How far out are you booking?

It moves with the season. Spring and fall fill first. Call and we will tell you honestly where you would land rather than telling you what you want to hear.

What if I already have a coating that is failing?

That is a normal starting point. It comes off in the grind, and what is underneath decides what the job actually is. We would rather find that on day one than after.

Do I have to coat it after grinding?

No. Plenty of people grind and seal and stop there, especially on a shop floor or a slab they like the look of. Grinding is a service on its own, not only a step toward a coating.

Got a slab in Sharpsburg?

Send a couple of photos and the rough square footage. We will tell you what it takes.

Call and you get Beto Ponce, not a call center. Or look through the gallery first.

(919) 440-1333