Home
Services
Service Areas
Gallery About Us Blog Contact Call · (919) 440-1333
Skip to content
Blue metallic epoxy garage floor with a high gloss finish in Wayne County, North Carolina
Blue metallic epoxy garage floor with a high gloss finish in Wayne County, North Carolina
Wilson's Mills, NC

Floors worth looking down at, Wilson's Mills.

Metallic, flake and quartz systems for homes around Wilson's Mills. Insured, bonded, and poured by the owner.

Insured and bonded · 5 years · every floor poured by the owner

Get a free quote

Photos and rough square footage get you a real number.

No obligation. We come look at the actual slab.

Wilson's Mills, NC

Resin floors for Wilson's Mills homes.

Wilson's Mills calls usually start the same way: the slab is dusting, there is a stain that will not come up, and somebody is tired of looking at it.

We run out to Wilson's Mills from the shop in Goldsboro, about 30 minutes out. Wilson's Mills is in Johnston County, and we cover the towns around it too, including Smithfield, Selma, Princeton, Pine Level.

Most garage floors in Wilson's Mills were poured, troweled, and never touched again. That slab has been soaking up whatever landed on it ever since.

Metallic, flake and quartz look nothing alike, but underneath they start the same way. The slab gets diamond ground to clean, open concrete, the cracks that turn up get chased and filled, and only then does the color go down with a topcoat over it. What you pick changes the look. The grind is what keeps it bonded for years.

Local conditions

What eastern North Carolina does to a slab.

Sandy ground and a water table that moves through the seasons are what make humidity the surprise here. Moisture sits close under the slab, and if the concrete has no vapor barrier it travels straight up through it, every day, for the life of the floor. Nothing about that changes when a coating goes on. A coating that lets vapor through survives it. One that traps it gets pushed up in blisters and sheets.

Some slabs should not be coated at all, and we would rather tell you that on day one than take the job. Testing comes before the quote for exactly that reason. Most wet slabs just need the right system, and we price that one. The few that are too far gone, we say so plainly.

The other local factor is heat. Resin cures by chemical reaction and the reaction runs faster when it is hot. A July pour in an uninsulated Wilson's Mills garage gives you less working time than the same pour in October, which matters most on metallic floors where the pattern is set while it is wet. We plan around it instead of fighting it.

The work

Recent pours

Black and gold metallic epoxy floor with a mirror gloss finish in Goldsboro, North Carolina
Black and gold metallic pour photographed close, high gloss with ceiling lights reflected
Black and white marbled metallic epoxy floor in a Wayne County, North Carolina home
Black and white marbled metallic floor in a dark interior room
Dark metallic epoxy garage floor with a sports car parked on it in Goldsboro, North Carolina
Dark metallic garage floor with a red Corvette parked on it, paver driveway beyond
What people ask for

Which rooms we end up in.

A standard two-car garage is the job that crosses our desk most weeks. Garages make up the bulk of what we pour, and the trigger is nearly always the same short list: a slab that has started dusting or an oil stain that has outlasted every cleaner thrown at it.

Countertops are the other half of the business. The resin pours over the counters that are already there, so a Wilson's Mills kitchen changes completely without a tear-out, without new cabinets, and without a week of plywood while a slab gets templated. See how countertop pours work.

Timing a pour around the weather.

Summer is not off limits. We start those pours early, before the day heats up, because heat shortens the time we have to work it. Winter is fine too when the slab is warm enough. The mild spring and fall weeks give the most room, which is why they book up before anything else.

What moves the price.

An old coating that has already failed is one of the bigger cost swings we see. All of it has to come off before anything new goes down, and that is grinding time. Deep oil and cracks that need chasing do the same thing. Square footage sets the base. The slab’s condition decides how far above it you land.

Photos are a good place to start. Send a couple along with the rough size, and we can tell you whether your project lands in the range you have in mind before anybody makes a trip. After that we come out, walk the slab, and give you a number that same day. It stays put once we begin.

How the two days run.

If you split the job by hours, day one gets most of them. That is the grinding: diamond tooling and dust extraction take the slab down to clean concrete, and whatever cracks and pits show up underneath get chased out and filled the same day. Day two is quick by comparison. The resin goes down, then the topcoat goes over it.

How fast you get the garage back depends mostly on the temperature. Resin keeps curing for days after it looks done, so light foot traffic is fine the next morning, while cars wait until day three in warm weather and day four when it is cooler. Parking early is how a brand new floor gets marked. And the room has to be empty when we start.

Why us

Who actually pours it.

Beto Ponce does the pours himself. The person who quotes your floor is the person standing on it with a squeegee.

Insured and bonded, 5 years of pours, and a phone the owner answers. See the gallery, read about the rest of Johnston County, or send photos of the slab.

If you are on the edge of town or just outside it, call and ask rather than assuming. Town lines and county lines rarely match how far a trailer actually has to drive, and the answer is usually yes. Alpha Resin covers 10 counties out of Goldsboro, and Wilson's Mills sits well inside that.

FAQ

Questions from Wilson's Mills customers

Can you coat a floor that already has something on it?

Usually. Old paint, failed sealer, and most previous coatings come off in the grind. If there is a moisture problem underneath we will tell you before we quote it, not after.

Is it slippery when wet?

Only if it is left smooth. Grit broadcast into the topcoat gives it traction, and we use it on garage floors, patios and pool decks where water is a given. A smooth topcoat is about as slick as polished concrete when wet.

How much does a floor cost?

We do not give phone prices, because they are not worth much. Once we walk the slab and you pick a system, you get a real number. Call (919) 440-1333 to get on the schedule for a look.

Do you work in cold weather?

We do. A Carolina winter leaves plenty of workable days, and the one thing we check closely is how cold the slab is, since resin cures by chemical reaction and cold slows it down. We would rather reschedule than pour into conditions that hurt the finish.

How long will it last?

A properly prepped residential floor is a ten to fifteen year surface. The ones that fail early almost always failed at prep, not at the resin.

Got a slab in Wilson's Mills?

Start with a few phone pictures and the rough dimensions. Beto will tell you what it would take to do it right.

Not ready to call? Browse the gallery first. When you do call, you talk to Beto Ponce, the owner.

(919) 440-1333